- Productions
- Back to the Future
- Original Production Call Sheet (100th Day of Filming)





Film · Auction 10
Original Production Call Sheet (100th Day of Filming)
- Lot
- 51
- Auction
- Auction 10
- Date
- February 27, 2021
- Outcome
- Sold at auction
- Category
- Movie · Memorabilia
This is an original production used call sheet dated Wednesday, April 17, 1985 (the 100th day of shooting). The two-sided paper details the requirements of the days shoot and measures 8.5" x 14". The shots filmed were of scenes inside Doc’s 1985 workshop of Marty blowing up the large speaker. This call sheet was issued to and used by Kevin Pike during the production.
The item(s) may have varying levels of wear and/or studio distressing, please see the listing images for exact condition.
This lot was sold at auction and is no longer available. Final prices are not published on this site. How Icons certifies its pieces.
More from Back to the Future
Original Production Call Sheet (33rd Day of Filming)Auction 10 · Lot 52
Set of Production Used Storyboard PrintsAuction 10 · Lot 53
Collection of Production PhotographsAuction 9 · Lot 32
Original Production Call Sheet (46th Day of Filming)Auction 9 · Lot 33
Original Production Call Sheet (81st Day of Filming)Auction 9 · Lot 34
Set of Production Used Storyboard PrintsAuction 9 · Lot 35