1. Productions
  2. Back to the Future
  3. Original Production Call Sheet (80th Day of Filming)
Back to the Future — Original Production Call Sheet (80th Day of Filming)
Back to the Future — Original Production Call Sheet (80th Day of Filming) (photo 2)
Back to the Future — Original Production Call Sheet (80th Day of Filming) (photo 3)
Back to the Future — Original Production Call Sheet (80th Day of Filming) (photo 4)
Back to the Future — Original Production Call Sheet (80th Day of Filming) (photo 5)
Film · Auction 8

Original Production Call Sheet (80th Day of Filming)

Back to the Future

Lot
36
Auction
Auction 8
Date
September 12, 2020
Outcome
Sold at auction
Category
Movie · Memorabilia

This is an original production used call sheet dated Tuesday, March 19, 1985 (the 80th day of shooting). The two-sided paper details the requirements of the days shoot and measures 8.5" x 14". The shots filmed were of scenes inside of the school the night of the “Fish under the Sea Dance”, including the legendary shot of Marvin calling his cousin Chuck. This call sheet was issued to and used by Kevin Pike during the production.

The item(s) may have varying levels of wear and/or studio distressing, please see the listing images for exact condition.

This lot was sold at auction and is no longer available. Final prices are not published on this site. How Icons certifies its pieces.